Aerospace parts carry paperwork as heavy as the metal. A bracket is not done when it is in tolerance; it is done when the material cert, the process certs and the first article report are in the file and match the revision on the drawing. Shopfloor reads the revision off the drawing, asks for the certificates up front, and keeps them on the thread so nothing is chased at dispatch.
Export-controlled work is sourced in the US only; Shopfloor asks the export question before any file leaves the thread. Machining in 7075, 6061, 4130, 17-4 PH and Ti-6Al-4V; sheet metal in 2024 and 5052; anodise, alodine and passivation through select partners. Shopfloor does not take ITAR work.

| Standard | What it covers | Who holds it | What you receive |
|---|---|---|---|
| AS9100 | Quality system for aerospace | Select partners, verified by Manufex | FAI per AS9102 on request |
| NADCAP | Special processes | Select finishing partners | Process cert |
| ITAR | Defense articles | Not offered. Shopfloor does not take ITAR work. |
No minimum, no production commitment, 8% on the quote.
by 