Thread
An injection molding press with a fresh enclosure half
Services · Injection molding

Injection molding, sourced.

Aluminum prototype tools in 2 to 4 weeks, hardened steel for production, insert and overmolding. Tool ownership stated in writing.

Start sourcing
Tooling 2 to 4 weeksISO 9001 shopsTool ownership in writingUS, India, China
Injection molded black enclosure half
Capabilities
ProcessMethodsMax part sizeToleranceLead time
Prototype toolingaluminum, 1 to 4 cavitiesto 400 × 400 mm partsper drawing, SPI finishes2 to 4 weeks
Production toolingP20 and H13 steelto 1,000 t pressesper drawing6 to 10 weeks
Insert and overmoldingtwo shot, manual insertper toolper drawingwith tool
Tooling 2 to 4 weeks
standard
tool + 1 week
lead time at 10, example
8%
flat fee on the quote
“The drawing is read before the price is written. That is the whole difference.”
From the thread
SO-2291 · Enclosure, 250 · ES-0874
Your wall at 0.8 mm will sink on the boss side. I suggested 1.2 mm; the shop agrees. Price unchanged.
Example from the Shopfloor thread format. Not customer data.
Materials
ABSPCPC/ABSNylon 6, 66PPTPEPOMPEEK
Materials guide →
Finishes
SPI A to DTexture (VDI, Mold-Tech)PaintPad printLaser etch
Finishes guide →
Lead times by quantity
QuantityTypical lead time
10tool + 1 week
100tool + 1 week
1,000tool + 2 weeks

Design for this process.

01
Uniform wall thickness, 1.5 to 3 mm for most resins.
02
Draft of 1° per side minimum, 3° on textured faces.
03
Ribs at 60% of the adjoining wall to avoid sink.
Full design guide →
How Shopfloor runs it

The agent quotes. A person signs off.

A person reviews the mold flow and gate plan with the toolmaker before steel is cut, and T1 samples are inspected before you see them.

Industries
Aerospace and DefenseAutomotiveMedicalElectronics and SemiconductorsData CentersRobotics and AutomationEnergy and BatteriesIndustrial MachineryConsumer HardwareDrones and Unmanned Systems

Six questions, answered.

Within the hour for most files. A Manufex engineer reads it before it reaches you.

Start with one part.

No minimum, no production commitment, 8% on the quote.

Start sourcingSee an example thread