Thread
A 5 axis machining centre mid cut
Services · CNC machining

CNC machining, sourced.

Shops matched to your geometry and tolerance, a person checking every quote, 5 to 15 day typical lead time.

Start sourcing
±0.025 mm standardISO 9001 shopsAS9100 select partners650+ partners
5-axis milled aluminum impeller
Capabilities
ProcessMethodsMax part sizeToleranceLead time
Milling3, 4 and 5 axis1,500 × 800 × 600 mm±0.025 mm, tighter on request5 to 15 days
Turning2 axis, live toolingØ 400 × 1,200 mm±0.025 mm5 to 15 days
Swisssliding headØ 1 to 32 mm±0.01 mm7 to 15 days
±0.025 mm standard
standard
5 to 7 days
lead time at 10, example
8%
flat fee on the quote
“The drawing is read before the price is written. That is the whole difference.”
From the thread
SO-2314 · Gripper housing, 40 · ES-0921
Journal grind on item 7 adds a secondary op, about $9 a part. Keep it, or accept turned Ra 0.8?
Example from the Shopfloor thread format. Not customer data.
Materials
Aluminum 6061, 7075Steel 1018, 4140Stainless 303, 304, 316Titanium Gr 5Brass C360Copper C110PEEKDelrin
Materials guide →
Finishes
As machinedBead blastAnodize type II and IIIPowder coatBlack oxidePassivateNickel plate
Finishes guide →
Lead times by quantity
QuantityTypical lead time
105 to 7 days
1008 to 12 days
1,00012 to 15 days

Design for this process.

01
Internal corners need a radius. One third of pocket depth is a safe start.
02
Keep walls above 0.8 mm in metal and 1.5 mm in plastic.
03
Standard drill sizes and thread depths of 3× diameter avoid a secondary op.
Full design guide →
How Shopfloor runs it

The agent quotes. A person signs off.

A Manufex engineer reads the drawing and the shop quote before it becomes yours. Ground finishes, tight bores and odd threads get a second look.

Industries
Aerospace and DefenseAutomotiveMedicalElectronics and SemiconductorsData CentersRobotics and AutomationEnergy and BatteriesIndustrial MachineryConsumer HardwareDrones and Unmanned Systems

Six questions, answered.

Within the hour for most files. A Manufex engineer reads it before it reaches you.

Start with one part.

No minimum, no production commitment, 8% on the quote.

Start sourcingSee an example thread