Progressive stamping, closed die forging, aluminum and zinc die casting and investment casting. Tooling and part lead times quoted as ranges you can hold us to.

| Process | Methods | Max part size | Tolerance | Lead time |
|---|---|---|---|---|
| Stamping | progressive, transfer | to 600 t | ±0.1 mm | tool 4 to 8 weeks, parts 2 to 4 weeks |
| Forging | closed die, steel and aluminum | to 25 kg | per drawing, machined datums | tool 6 to 10 weeks |
| Die casting | aluminum A380, zinc Zamak 3, 5 | to 800 t | ±0.1 mm per 25 mm | tool 6 to 12 weeks, parts 3 to 5 weeks |
| Investment casting | steel, stainless, aluminum | to 50 kg | CT6 to CT8 | tool 4 to 8 weeks, parts 4 to 6 weeks |

| Quantity | Typical lead time |
|---|---|
| 10 | tool + 2 weeks |
| 100 | tool + 3 weeks |
| 1,000 | tool + 4 weeks |
Tool design and sample approval are run by a Manufex engineer. Nothing goes to production until you have signed off a measured sample.
No minimum, no production commitment, 8% on the quote.