Thread
An SLS print lab, part being depowdered
Services · 3D printing

3D printing, sourced.

FDM, SLS, SLA, MJF and DMLS from audited print shops, with material and orientation checked by a person. 3 to 10 days.

Start sourcing
5 processesISO 9001 shopsISO 13485 select partnersUS, India, China
SLS nylon lattice
Capabilities
ProcessMethodsMax part sizeToleranceLead time
FDMULTEM, PC, ABS900 × 600 × 900 mm±0.3 mm or ±0.2%3 to 7 days
SLS and MJFPA12, PA11, glass filled380 × 280 × 380 mm±0.3 mm or ±0.3%3 to 7 days
SLAstandard, tough, clear resins500 × 500 × 400 mm±0.1 mm or ±0.2%3 to 7 days
DMLSAlSi10Mg, 316L, Ti64, Inconel250 × 250 × 300 mm±0.1 mm or ±0.2%7 to 10 days
5 processes
standard
3 to 5 days
lead time at 10, example
8%
flat fee on the quote
“The drawing is read before the price is written. That is the whole difference.”
From the thread
SO-2302 · Duct, 12 · ES-0897
MJF in PA12 holds the 1.0 mm wall. SLS would not. Orientation set for the flange face.
Example from the Shopfloor thread format. Not customer data.
Materials
Nylon PA12Nylon PA11ULTEM 9085Standard resinTough resinAlSi10Mg316LTi64
Materials guide →
Finishes
As printedBead blastVapor smoothDye blackPaintMachined datums
Finishes guide →
Lead times by quantity
QuantityTypical lead time
103 to 5 days
1005 to 8 days
1,0008 to 10 days

Design for this process.

01
Minimum wall 1.0 mm in SLS and MJF, 0.8 mm in SLA.
02
Powder escape holes of 3 mm or more for hollow parts.
03
Orient the part for the critical surface and say which one it is.
Full design guide →
How Shopfloor runs it

The agent quotes. A person signs off.

Process and material choice is confirmed by a person before the build starts. Metal prints get a stress relief and datum machining plan on the quote.

Industries
Aerospace and DefenseAutomotiveMedicalElectronics and SemiconductorsData CentersRobotics and AutomationEnergy and BatteriesIndustrial MachineryConsumer HardwareDrones and Unmanned Systems

Six questions, answered.

Within the hour for most files. A Manufex engineer reads it before it reaches you.

Start with one part.

No minimum, no production commitment, 8% on the quote.

Start sourcingSee an example thread