Thread
A press brake on a fabrication floor
Services · Sheet metal fabrication

Sheet metal, sourced.

Laser, waterjet, bending, welding and PEM insertion from matched fabricators. Powder coat, anodize and plating in the same quote. 7 to 14 days.

Start sourcing
0.5 to 12 mmISO 9001 shopsFinishing includedUS, India, China
Bent steel bracket with PEM inserts
Capabilities
ProcessMethodsMax part sizeToleranceLead time
Laser cuttingfiber3,000 × 1,500 mm, 20 mm steel±0.1 mm7 to 14 days
Waterjetabrasive3,000 × 2,000 mm, 100 mm±0.2 mm7 to 14 days
BendingCNC press brake3,000 mm, 100 t±0.5° angle, ±0.2 mm7 to 14 days
WeldingTIG, MIG, spotassemblies to 2 mper drawing10 to 14 days
0.5 to 12 mm
standard
7 to 9 days
lead time at 10, example
8%
flat fee on the quote
“The drawing is read before the price is written. That is the whole difference.”
From the thread
SO-2277 · Bracket L, 200 · ES-0866
Hole to bend is 1.8T on the slot. I moved it to 2.5T plus radius in the flat; no change to the mating face.
Example from the Shopfloor thread format. Not customer data.
Materials
Mild steelStainless 304, 316Aluminum 5052, 6061CopperGalvanized steel
Materials guide →
Finishes
Powder coatAnodizeZinc platePassivateBrushedSilk screen
Finishes guide →
Lead times by quantity
QuantityTypical lead time
107 to 9 days
1009 to 12 days
1,00012 to 14 days

Design for this process.

01
Inside bend radius at least one material thickness.
02
Hole to bend distance of 2.5× thickness plus the radius.
03
Call out PEM hardware by part number, not by description.
Full design guide →
How Shopfloor runs it

The agent quotes. A person signs off.

Flat patterns and bend sequences are checked by a Manufex engineer, and the finish spec is confirmed with the coater before the order is placed.

Industries
Aerospace and DefenseAutomotiveMedicalElectronics and SemiconductorsData CentersRobotics and AutomationEnergy and BatteriesIndustrial MachineryConsumer HardwareDrones and Unmanned Systems

Six questions, answered.

Within the hour for most files. A Manufex engineer reads it before it reaches you.

Start with one part.

No minimum, no production commitment, 8% on the quote.